Operations Hub

See Claude at Work

← Operations Hub

Before anyone starts using Claude, this page lets you watch real Paragon work done with it — the questions asked, the files it read, and what it produced. Each example is a view-only copy of a real chat: you can read every step, but you can't type into it or change anything.

How to open one

  1. Click Open on an example below.
  2. The first time, Claude asks you to sign in — use your Paragon work email. (If you don't have a Claude sign-in yet, ask Stephanie.)
  3. Scroll from the top. Read what was asked, then what Claude did and what came out.

A shared chat opens only for someone signed in with a Paragon work account — anyone else gets a sign-in page. If an example says Not shared yet, ask Stephanie.

Examples

What to notice: Claude reads the actual documents and says where each answer came from (sheet, page, section). It flags what it couldn't find instead of guessing, and it asks before it does anything that can't be undone. That's the standard to hold it to when your turn comes.