Load Vista Exports
Three anchors drive the full reconciliation: Contract Profit (File 1) = contract entitlement · PC Summation (File 6) = every dollar posted in Vista · Progress vs. Billed (File 7) = what's been invoiced to the owner. Together they close the loop on unrecovered exposure and unbilled contract value. Report 490, CrossTab CT & Report 520 (Files 2–5) add cost-type detail.
or use the weekly summary report as File 1 alternative
billing verification
CFO review questions
change order upside
quantities (Field Slice)
☰  What each file combination unlocks ▼
Files Loaded View Name What You See Why It's Valid
Step 2 — Select Jobs to Include
All jobs are included by default. Uncheck any you want to exclude from this session. Excluded jobs cannot be recovered without reloading.
|
All processing happens in your browser — no data is uploaded or transmitted. · Load files manually

Methodology — Earned Value Method

% Complete & Earned Value% Complete = Actual Cost ÷ Est. Final Cost. Earned Value = Revised Contract × % Complete.
Over / (Under) BilledBilled to Date − Earned Value. Positive = collected ahead of work. Negative = cash exposure.
Phase VarianceActual − Budget per phase code. Unbudgeted (.888/.999) = cost with no estimate loaded.
Health Code Phases.888 = CO/write-off (pay-app quantity overrun) · .999 = negotiate & bill (T&M extra work) · .777 = claim capture (unique billing). See Job Health Codes tab.
Active Job Register
Show / Hide Jobs
Job # Name Rev. Contract % Complete Earned Value Billed to Date Over/(Under) Proj. GP% CTC Status Field Slice
.888 — CO / Write-OffQuantity overrun on pay-app job (ODOT-style). Bill through CO or log as estimator error.
.999 — Negotiate & BillExtra work on T&M job. Pursue billing while job is negotiated.
.777 — Claim CaptureClaim overrun. Track separately and bill uniquely.
Jobs with Health Code Phases
Health Code Jobs

⬆ Publish Field Slice

Creates a PIN-protected URL for that supers can open on any device — no Vista access needed.
✓ Published — share this link with the super
Supers open it with the team viewer PIN.

⬆ Publish All to Team

Publishes a PIN-protected field slice for every active job and a team page at /team the whole crew opens with one PIN.
✓ jobs published — share this with the crew
The crew opens it with the team viewer PIN.

💬 Ask about

Ask in plain English — e.g. "why am I over budget when we haven't started?" or "what's driving the overrun on clearing?" Answers come from this job's loaded reports.